FDOT: Work on Phase 2 of Little Pine Island Bridge project continues
The Florida Department of Trans-portation has issued the following update on the Pine Island Road Causeway and Bridge Permanent Repairs project.
Construction project: Phase 2 of construction has begun on the Little Pine Island Bridge. All traffic has shifted onto the newly constructed westbound side of the bridge, allowing twolane traffic on the new bridge. Safety remains the top priority, so FDOT reminds everyone:
• Motorists are asked to exercise caution and reduce their speed while driving through the work zone.
• Pedestrian access to the bridge is not allowed during construction, this includes fishing, and all other recreational use.
• Motorists are reminded not to block driveways or entrances and to follow all posted signage throughout the construction zone.
• Noise from construction equipment in the area is to be expected.
• Since the start of construction with the Little Pine Island Bridge, boaters are asked to be aware of construction equipment and erosion control measures that are in place.